Location

Grande Prairie, AB

SIZE

40,000 square feet

Completion

2014

Value

$4,390,000

PROJECT HIGHLIGHTS

  • School remained fully occupied throughout construction
  • New building envelope construction around failed existing membrane

Structural and building envelope upgrades of an existing school facility.  The scope of the project included removal of an existing flat roof membrane and the installation of  structural steel members to support a new load-bearing roof assembly above the failed existing roof.  The exterior cladding of the building was removed and replaced, and a number of architectural upgrades were completed within and outside the building.